We are building a frame house with a terrace. Frame houses with terrace

Built country house By frame technology plus a small veranda. The cost turned out to be quite economical, and the time frame was 3 and a half months. We even finished it a couple of weeks earlier than promised. We only go to the dacha in the summer, so I can’t say anything about thermal insulation. Thank you

Thank you very much for building a house made of aerated concrete. The quality of both the material and work is excellent - FRIENDS WILL BE JEALOUS. Time frame for completed work: a house was built from scratch in approximately 4.5 months. Good luck to all of you, good clients And big houses!!


They built our house in 3 months (they started the foundation at the end of summer, and finished the walls and interior decoration) , it didn’t turn out cheap, but everything was thought out, our participation was minimal. This year we are building a bathhouse together with them! Thank you for such professional guys that you provided us with!


Thank you so much for your work and attitude! Everything is efficient, high quality, fast! Thanks to the team led by Alexey!


The company built me ​​a great one summer house! I don’t have any complaints about the company; next summer I’m going to build a bathhouse and a garage. I’ll definitely contact them. Thanks to everyone, especially Sergei’s team, who built it for me, a lot depends on them!


We built a house from aerated concrete in your company - I’m very pleased. The house was erected on our pre-prepared foundation in 45 days. And as a gift we received home insurance for a year. So I recommend it.


In August 2017 I ordered the foundation ( monolithic slab) for a house in the Leningrad region. In 2018 I already ordered the house itself. I can recommend it because... We were pleased with the result. Everything was done quickly and professionally.


We ordered a house and garage from this company in the summer of 2016. The builders worked for about 4 months, without a break (they really liked it). Everything was done according to the agreement, extra money didn't ask.


Frequently asked questions before construction

About company

How long has your company been in business?

Our company began work as a repair and finishing company in 2007. From that moment on, we have grown into the construction industry and all thanks to our employees. Special thanks for the work invested in the development of the company.

How is the competence of specialists confirmed?

All architects and engineers of the company have qualification certificates. Because the project is not subject to a company license, but to an architect’s certificate. By law, responsibility for the project lies with the architect.

Does your company do all the work? Or do you use contractors?

  • We ourselves carry out general construction, Finishing work, site arrangement, wiring of engineering systems (electricity, heating throughout the house, water supply) and so on.
  • We invite contractors to work that we do not perform every day and require specialization, for example: production and installation of windows and doors (special orders), air conditioning systems, boiler room equipment, installation of wells, septic tanks.
  • Searching, attracting, complying with agreements and monitoring the performance of work by contractors is our task.
  • We carry out 80% of all work on the construction of your home ourselves and only 20% involve contractors.
  • We enter into an agreement with each contractor in which he specifies a guarantee for the work performed by him, and in case of malfunctions, their elimination is the responsibility of the contractor.

Is it possible to see objects that are currently in operation?

Yes, there are objects that we can show at different stages works and already completed houses by prior arrangement.

about the project

Should I buy a standard project or order an individual one?

Buy a ready-made project.

  • Plus is the price.
  • The downside is that it will not include all your wishes regarding materials and layouts. Also, it will require modification to suit the characteristics of your site.

Buy a ready-made project and modify it.

It all depends on the changes you want to make. It is possible that developing an individual project will be more profitable for you than modifying a standard one.

The cost of such modifications must be discussed during the meeting.

Development individual project Houses.

  • Pros: all your wishes regarding all characteristics of the house and site are taken into account.
  • The downside is that the cost of such a project is higher than a standard one.

BUT! You can develop an individual project for free. If our company builds, then the development of an individual project is free for you.

How is an individual project developed?

  • The development of an individual project begins with the signing of a contract and the first meeting with the architects, at which the client voices his wishes. Based on the results of the meeting, a design assignment is drawn up, which is an annex to the contract.
  • Architects prepare several versions of sketches and decide with the client in which direction to move next. Over the entire design period, several meetings take place with the client, at which all architectural and design solutions are worked out in detail until the client is satisfied with everything, which he confirms with a signature on the Draft Design.
  • Next, a working draft is developed. This is the calculation phase of each design solution in which the client is not involved.
  • This entire process takes from 2 weeks to 2 months, after which the client receives a finished project with ready-made detailed calculations, which is necessary when submitting documents for a building permit.

About construction

Will you go to the site where construction is planned?

Yes. When inspecting the site, we take into account the size, access from the road and its width, the proximity of neighboring buildings, the presence of a slope or drop, cardinal directions and what kind of soil is on the site.

Do you help with choosing a site for construction?

Yes. Our specialists help with site selection. They will help you find it according to your requirements on the Internet with advertisements.

What affects the final price of a home?

The cost of building a house is affected by:

  • site features: relief, entry conditions, location
  • materials used in construction
  • house architecture features
  • work conditions (working time restrictions)

What guarantees do you provide?

We provide a 3-year guarantee on our work. The manufacturer provides a guarantee for materials and it is different in each case. There are materials for which the manufacturer provides a lifetime warranty.

How can I control construction?

  • We send each client step by step photo work report.
  • We install online video surveillance of the facility 24 hours a day, you and the company’s specialists have access to it (paid service).
  • You can also use the services of companies that provide technical control.
  • The construction is carried out in stages, you always see which stage and only after accepting one, we proceed to the next.

When is the contract signed?

  • The design contract is signed at the meeting, before the first communication with the architect.
  • The construction contract is signed after the estimate has been developed and approved.

When should I pay for your work?

For design, an advance payment is required within 5 days after signing the contract in the amount of 70% of the total amount. The balance is paid upon delivery of the finished project to the client.

Payment for construction is broken down according to the stages specified in the estimate. Each stage of construction is also divided into payments, the size of which may vary (usually due to the need to purchase materials)

How are builders placed?

  1. It will be convenient if you have the opportunity to place builders near the construction site, it will be suitable garden house, construction trailer, an old house or any other building with a roof.
  2. If there is nothing like that, then we are ready to bring our change house for FREE.
  3. In extreme cases, we will accommodate our builders in a nearby hostel

What communications are needed to start construction: electricity, water?

Electricity with a power of at least 5 kW and technical water.

If this is not the case, then we will bring our generators FREE OF CHARGE. In most cases, water wood construction used only for household needs, we will provide its delivery on our own.

What time of year do you carry out construction?

We build all year round, one of important conditions in the spring-autumn period this is a suitable road for vehicle access.

WHAT CAN WE DO FOR YOU?

We will help you save by correctly calculating the estimate and choosing high-quality materials.

Perform quality project documentation, thanks to which you can not worry about the design decisions made.

We work throughout the Moscow region

Volokolamsk district, Voskresensky district, Dmitrovsky district, Yegoryevsky district, Zaraisky district, Istra district, Kashirsky district, Klinsky district, Kolomna district, Krasnogorsk district, Leninsky district, Lotoshinsky district, Lukhovitsky district, Lyubertsy district, Mozhaisk district, Mytishchi district, Naro-Fominsk district, Noginsk district, Odintsovo district, Ozersky district, Orekhovo-Zuevsky district, Pavlovo-Posadsky district, Podolsky district, Pushkinsky district, Ramensky district, Ruza district, Sergiev Posad district, Serebryano-Prudsky district, Serpukhov district, Solnechnogorsk district, Stupinsky district, Taldomsky district, Chekhov district, Shatursky district, Shakhovsky district, Shchelkovsky district.

A terrace is a platform raised above the ground, which is adjacent to the main building or stands separately from it. Frame houses with a terrace are very popular, which allow you to get cozy housing, but save on construction.

Advantages of housing with a terrace

Frame buildings are characterized by the following properties:

· short construction time;

· variety design solutions;

· savings on the foundation;

· no shrinkage;

· moderate cost.

Construction technology

A frame house is built using the following technologies:

· Frame-panel. The timber frame is constructed on construction site, and insulated panels are manufactured at the factory and delivered ready-made.

· Frame-panel. First, a frame is constructed at the construction site, and then work is carried out on its cladding and insulation.

If you are interested in building frame houses with a terrace, contact the SK-Plotnik company. We work throughout Moscow and Moscow Region. The construction procedure takes place in several stages, starting with approval of the project and ending with the commissioning of the facility. We are ready to advise you on the features, cost and timing of construction work.

The veranda is one of the simplest and most useful extensions for a backyard cottage. This design looks equally good with a one-story and two-story house. It is capable of performing different functions. Even be used throughout the year.

Moreover country houses may initially be conceived with a veranda or it may be completed later.

Types of frame verandas

There are several types of extensions. Each variety has character traits, which should be taken into account when choosing.

  • Capital.

Initially included in the cottage project. They are erected simultaneously with the frame of the house. They have a common foundation and a single roof. As a rule, such extensions are fully insulated and can be used in any weather. In fact, this is a full-fledged room that can be used as a bedroom, recreation room or winter garden.

  • Attached.

Attached to the cottage after completion capital construction. It has its own foundation and its own roof. Possesses minimal insulation, or is not insulated at all. It is customary to place a summer kitchen or dining room in such premises.

  • Open.

Veranda without a roof and without insulation. Ideal for the role of a gazebo. Helps save space land plot, eliminating the need to build a gazebo in the garden.

  • Glazed.

Verandas with minimal insulation and large panoramic windows. Suitable for the role of rest rooms, winter gazebos, summer kitchens with barbecue. Glazed extensions are so successful that in warm weather all family members gather in them.

Frame houses with a veranda: key advantages

In addition, the veranda allows you to improve the thermal insulation of the house. It serves as a buffer between environment and the main building. As practice shows, the presence of such an extension increases the thermal efficiency of the cottage by 15-20%.

Huge selection finished projects, representing frame houses with a terrace, are offered by the Dachny Sezon company. They take into account the basic wishes of clients, lay down functional and utility blocks(boiler room, garage, boiler room).

Order a professional project for your own home

Our catalog contains a variety of designs of houses with a terrace in standard and individual designs. The area can be open, glazed, with railings or decorative handrails. In summer, a house with a terrace can be decorated with climbing plants: it will be cozy and cool. Typical projects make it possible to significantly speed up the construction of a structure and reduce material costs, but the houses will look like the original buildings due to individual exterior and interior decoration.

For each project, a terrace of rectangular, square or diamond-shaped configuration is provided. If the client wishes, it will be made in a semicircular form or non-standard shape. The open area is a good place to relax, receive guests and play board games.

If in the drawings the extension is located directly next to the building, you can choose a house design with a veranda. Its glazed version will serve natural barrier between the street and your hallway.

A terrace is a specially equipped area intended for relaxation or entertainment. The main difference between a terrace and a veranda is that the veranda is always attached to the house and can be equipped for permanent residence.

In turn, the terrace may be adjacent to the cottage, or may be part landscape design or connect the main building and a swimming pool or sauna.

What types of terraces are there?

Terrace projects are traditionally divided into two types:

  • Open.

They only have a roof and the lower part of the walls (about a meter high). The roof of such a terrace is created separately from the main house. It is supported on special support beams. Such an extension is used as a gazebo or as a place for cooking on open flame. It is much more practical than a gazebo in the garden and gives the house a certain charm.

  • Closed.

This open terrace in which free openings are glazed. It turns out to be a single space where it penetrates a large number of sunlight. This allows the extension to be used even in rainy weather or strong winds. However, there is no insulation in it. Therefore, use is limited late spring and in summer.

A well-designed extension harmonizes with the one-story 6x6 cottages, giving them additional functionality.

What building materials should be used?

Frame houses with a terrace require the use of special building materials. This extension is not airtight and requires special care.

There are materials specifically designed for service on outdoors. Floorboards coated with a polymer composition are used. It protects the wood from rotting, which allows it to effectively withstand rain and snow.

The frame of the extension must be impregnated with a special solution against mold, black rot, and insects. Every spring the condition of the materials should be inspected. In this case, scheduled repairs will have to be carried out. If you delay maintenance, the extension will quickly lose its strength and begin to collapse.