Major renovation of a school building: how to write justifications, plans, estimates? Current and major repairs in educational institutions Contract for major repairs of a building.

Summer is the time for renovation work educational institutions. As a rule, current and capital investments are planned for this period. renovation work. The form of financing depends on what type of work will be performed. In the article we will look at the differences between current repairs from capital and how repair work should be reflected in accounting.

Deciding on repairs

One of the main documents that should be followed when preparing to carry out repair work on buildings and structures is the Regulations on the organization and implementation of reconstruction, repair and maintenance of buildings, communal and socio-cultural facilities (together with VSN 58-88 (r)) , approved By order of the State Committee for Architecture under the USSR State Construction Committee dated November 23, 1988 No. 312 (hereinafter referred to as VSN 58-88 (r)).

According to the standards of this document ( clause 3.2 VSN 58-88 (r)) the institution must monitor the technical condition of buildings and facilities by conducting systematic scheduled and unscheduled inspections using modern means technical diagnostics, which, in turn, will help make a decision on the need for one or another type of repair work.

Routine inspections are divided into general and partial. During general inspections, the technical condition of the building or facility as a whole, its systems and external amenities should be monitored; during partial inspections, the technical condition individual designs premises, elements of external improvement ( clause 3.3 VSN 58-88 (r)).

Unscheduled inspections are carried out after natural Disasters(earthquakes, mudflows, rainstorms, hurricane winds, heavy snowfalls, floods and other phenomena), which can cause damage to individual elements of buildings and objects, after accidents in heat, water, energy supply systems and when detecting foundation deformations ( clause 3.4 VSN 58-88 (r)).

According to clause 3.5 VSN 58-88 (r) General inspections should be carried out twice a year: in spring and autumn.

During the spring inspection, you should check the readiness of a building or facility for operation in the spring-summer period, establish the scope of work to prepare for operation in the autumn-winter period, and clarify the scope of repair work for buildings and facilities included in the routine repair plan in the year of the inspection.

During the autumn inspection, you should check the readiness of a building or facility for operation in the autumn-winter period and clarify the scope of repair work on buildings and facilities included in the next year’s routine repair plan.

During general inspections, one should also monitor the compliance by tenants and tenants with the terms of lease and rental agreements, if any.

The results of inspections should be reflected in accounting documents technical condition building or facility (technical condition logs, special cards, etc.). These documents must contain:

  • assessment of the technical condition of a building or object and its elements;
  • identified faults;
  • their location;
  • the reasons that caused these malfunctions;
  • information about repairs performed during inspections.
Generalized information about the condition of a building or facility must be reflected annually in its technical passport ( clause 3.9 VSN 58-88 (r)).

According to the definition given in Appendix 1 to VSN 58-88 (r), building renovation - it's a complex construction work and organizational and technical measures to eliminate physical and moral wear and tear that are not related to changes in the main technical and economic indicators of the building.

Let's look at the definitions of current and major repairs, which are also given in Appendix 1 to VSN 58-88 (r):

Maintenance should be carried out at intervals that ensure efficient operation building or facility from the moment of completion of its construction (overhaul) until the moment it is put on the next major renovation(reconstruction). In this case, natural and climatic conditions must be taken into account, Constructive decisions, technical condition and mode of operation of the building or facility ( clause 4.1 VSN 58-88 (r)).

Work that should be classified as routine repairs is listed in Appendix 7 to VSN 58-88 (r). This list is quite large and it names most of the repair work, which covers the entire building from the foundation to the roof, including the exterior and interior decoration, as well as all engineering communications.

Major renovation should include troubleshooting of all worn elements, restoration or replacement (except for complete replacement of stone and concrete foundations, load-bearing walls and frames) to make them more durable and economical, improving the performance of buildings being repaired. At the same time, economically feasible modernization of a building or facility can be carried out: improving the layout, increasing the quantity and quality of services, equipping with missing types of engineering equipment, landscaping the surrounding area ( clause 5.1 VSN 58-88 (r)).

Scroll additional work carried out during major repairs is given in Appendix 9 to VSN 58-88 (r). It is not as large as the list of ongoing repairs. According to it, major repair work includes:

  • inspection of buildings and production of design estimate documentation(regardless of the period of repair work);
  • equipment with cold and hot water supply, sewerage, gas supply systems with connection to existing main networks at a distance from the input to the connection point to the mains up to 150 mm;
  • transfer of the existing power supply network to higher voltage;
  • installation of automatic fire protection and smoke removal systems;
  • changing the roof structure;
  • equipment attic spaces residential and non-residential buildings for exploitation;
  • insulation and noise protection of buildings;
  • replacement of worn-out elements of intra-block utility networks;
  • repair of built-in premises in buildings;
  • examination of design and estimate documentation;
  • designer's supervision of design organizations;
  • technical Supervision.
According to clause 5.2 VSN 58-88 (r) As a rule, the building (facility) as a whole or part of it (section, several sections) should be subject to major repairs. If necessary, major repairs of individual elements of a building or facility, as well as external improvements, can be carried out.

Determining the cost of work

To carry out repair work, based on the results of the inspections, it is necessary to draw up a defective statement. The form of this document is not approved by law, therefore it can be developed by the institution itself, taking into account the requirements for primary accounting documents specified in Art. 9 of the Federal Law of December 6, 2011 No.402-FZ “On Accounting”, and attach it to the accounting policy.

Based on the defective statement, a decision is made to carry out routine or major repairs. If minor repair work is carried out by the institution itself, then the necessary materials will be purchased and the work will be carried out.

If a decision is made to carry out routine repairs by a contractor, then in accordance with clause 4.4VSN 58-88 (r) To do this, the principles of pricing and the procedure for payment for work performed, provided for major repairs, should be applied.

In turn, in accordance with clause 5.7VSN 58-88 (r) determination of the cost of major repairs of objects should be carried out on the basis of estimated or contract prices. The contractual price of each repair item must be determined on the basis of an estimate compiled according to the prices, norms, tariffs and rates established for major repairs, taking into account the scientific and technical level, efficiency, quality, timing of work and other factors. The estimates must include overhead costs, planned savings, other work and costs.

The estimate documentation must provide for a reserve of funds for unforeseen work and units, distributed into two parts:

  • intended to pay for additional work caused by clarification of design solutions during repairs or reconstruction (customer reserve);
  • intended to reimburse additional costs arising during repairs or reconstruction when the methods of work are changed against those adopted in the estimated standards and prices (contractor's reserve).
Following the total of the estimates, refundable amounts must be indicated - the cost of materials from dismantling structures and dismantling engineering and technological equipment, determined based on the standard yield of recyclable materials and products at repair sites.

The development of design and estimate documentation for major repairs and reconstruction of buildings (facilities) should include ( clause 5.8VSN 58-88 (r)):

  • carrying out technical inspection, determination of physical and moral wear and tear of design objects;
  • drawing up design estimates for all design decisions for redevelopment, functional reassignment of premises, replacement of structures, engineering systems or their re-installation, landscaping and other similar work;
  • feasibility study of major repairs and reconstruction;
  • development of a project for organizing major repairs and reconstruction and a project for the execution of work, which is developed by the contractor.

Financing of work

Financing of current and capital repairs of state-owned educational institutions will be carried out in accordance with the budget estimate, and budgetary and autonomous institutions - through subsidies for other purposes or subsidies for the implementation of state assignments.

Targeted financing of current and capital repairs is carried out within the framework of various federal programs. So, for example, within federal program on modernization of regional systems preschool education in 2014 according to By Decree of the Government of the Russian Federation dated January 14, 2014 No.22 the procedure for providing and distributing federal subsidies to regional budgets has been determined, including for current and major repairs of preschool educational institutions.

When placing orders for current and major repairs, autonomous institutions must comply with the requirements Federal Law of July 18, 2011 No.223-FZ “On procurement of goods, works, services certain types legal entities» and the developed Procurement Regulations, and state and budgetary educational institutions - all procedures provided for Federal law dated 04/05/2013 No. 44-FZ “On the contract system in the field of procurement of goods, works, services to meet state and municipal needs”, regardless of whether a contractor is involved in this work or materials are purchased to carry out repair work by the institution.

Let us recall that educational institutions have the right to a simplified procedure for concluding contracts with a single supplier if the price of such a contract does not exceed 400,000 rubles. ( pp. 5 p. 1 art. 93 Federal Law No.44-FZ At the same time, the total annual volume of purchases that the customer has the right to make on the basis of this clause should not exceed 50% of the amount of funds provided for all purchases of the customer in accordance with the schedule, and amount to no more than 20 million rubles. in year.

Reflection in accounting of repair work

Minor differences in the accounting treatment of repair work will depend on whether third-party contractors are involved. Let's consider two options:
  1. Repairs are carried out by the institution itself.
  2. The repairs are carried out by a contractor.
With option 1, as a rule, only the purchase is made necessary materials. In the 2nd case, the cost of the work carried out includes the cost of materials.

The cost of current and major repairs does not increase the cost of the buildings and structures themselves being repaired.

According to Instructions No.65n the acquisition of consumables (construction and finishing) materials is carried out by the institution for subarticle 340“Increasing the cost of inventories” KOSGU.

Settlements with contractors for payment for services for the repair of buildings and structures will be carried out at the expense of subarticle 225“Works, services for property maintenance” KOSGU.

The organization and implementation of repair work in accounting will be reflected on the basis of primary accounting documents (act of write-off of inventories (f. 0504230), act of acceptance and delivery of repaired, reconstructed, modernized fixed assets (f. 0306002), etc.) from government institution in accordance with Instruction No.162n , budgetary institution - Instruction No.174n, and an autonomous institution - Instruction No.183n .

The purchase of materials from suppliers and their write-off for the needs of the institution will be reflected in accounting as follows:

State institutionState-financed organizationAutonomous institution
DebitCreditDebitCreditDebitCredit
Purchase of materials for repairs
1 105 34 340 1 302 34 730 0 105 34 340 0 302 34 730 0 105 34 000 0 302 34 000
Write-off of materials spent on repairs
1 401 20 272 1 105 34 440 0 401 20 272

0 109 xx 272

0 105 34 44 0 401 20 272

0 109 xx 272

0 105 34 000

When performing repair work by a contractor, the following accounting entries will be made in the institutions' records:

State institutionState-financed organizationAutonomous institution
DebitCreditDebitCreditDebitCredit
Reflection of debt to the contractor
1 401 20 225 1 302 25 730 0 401 20 225

0 109 xx 225

0 302 25 730 0 401 20 225

0 109 xx 225

0 302 25 000
Advance payment to the contractor
1 206 25 560 1 304 05 225 0 206 25 560 0 201 11 610 0 206 25 000 0 201 11 000
Final settlement with the contractor
1 302 25 830 1 304 05 225 0 302 25 830 0 201 11 610 0 302 25 000 0 201 11 000
Set-off of previously paid advance
1 302 25 830 1 206 25 660 0 302 25 830 0 206 25 660 0 302 25 000 0 206 25 000

Let's look at a few examples.

State educational institution as part of ongoing repairs on our own made a replacement flooring in the dining room. For these purposes, linoleum was purchased in the amount of 40,000 rubles. with 100% prepayment to the supplier.

These business transactions will be reflected in budget accounting as follows:

A budgetary educational institution, using funds from a targeted subsidy, carried out a major overhaul of the façade of the building. The cost of the work amounted to 2,000,000 rubles. According to the agreement, a 30% prepayment is provided. Upon completion of the work, a certificate of completion was signed and the final payment was made to the contractor.

These facts economic life in the accounting records of a budgetary institution will be reflected as follows:

Contents of operationDebitCreditAmount, rub.
An advance payment was made to the contractor under the contract

(RUB 2,000,000 x 30%)

5 206 25 560 5 201 11 610 600 000
The debt to the contractor is reflected 5 401 20 225 5 302 25 730 2 000 000
The previously transferred advance payment was offset upon completion of the work. 5 302 25 830 5 206 25 660 600 000
The final payment was made to the contractor after signing the certificate of completion of work

(2,000,000 - 600,000) rub.

5 302 25 830 5 201 11 610 1 400 000

To determine the need for current or major repairs, the institution must monitor the technical condition of buildings and conduct systematic inspections for this purpose. Before starting repairs, it is necessary to carry out procurement or contract procedures in accordance with current legislation and determine sources of financing for the planned activities. Depending on the chosen forces and means of repair, these facts of the economic life of the institution must be reflected in budgetary or accounting records.

We will send the material to you by e-mail

The long-awaited renovation of the apartment! In order for you not to hate it in a couple of years, you need to prepare for it. An example of an estimate for the renovation of a premises will help with this, because such data will show how much and in what volumes you need to invest to get the home of your dreams. This is not just a list of purchases, but a whole document that can be entrusted to specialists, but be prepared for inflated costs. You can just as successfully compose it yourself, it’s just important to know how.

The estimate includes all expenses and calculates any unforeseen costs, including the services of specialists in various fields. In order to make an estimate, you need:

  • Take measurements of the room. This includes the height and length of all walls, the length of wiring, cables, water supply and thermal communications, if any are included in the repair. After receiving information on dimensions, you can, which will become the basis for calculating the necessary roughing and finishing materials. It is important to have data on the area of ​​walls, floors and ceilings.
  • Based on the data obtained, it is necessary to calculate rough materials - make a reserve of at least 5-10% in this case.
  • Next comes the selection and calculation of the necessary decorative materials.
  • Now the most interesting and exciting part: price monitoring. You need to know how much draft and Decoration Materials, the cost of services of a designer and a team of repairmen, plumbers, electricians and other specialists who may be involved in the repair process. It is best to draw out a table and indicate several options for each item - this will allow you to avoid making a mistake with your choice.


All received data needs to be recorded and then compiled into one table: this way you will have a work plan + the cost of materials and the cost of paying specialists. It is also necessary to indicate the timing of the work, and if the injection of funds is partial, then their dates of such receipts.

Nuances

An estimate is not only technical information; it includes an element of creativity. Technical aspect– this is at least minimal knowledge of the processes that will occur during the repair, understanding of the market building materials what is needed for what.


Creativity– this is the competent distribution of all cost items in accordance with the needs at a particular stage of work. It is important to take a balanced approach to choosing a team if you trust this to specialists. Don't flatter yourself low prices– it’s likely that the quality there will be the same. It’s better to make an estimate yourself; minimal data and numerous templates will help you with this. Why is it better to do it yourself? Everything is very simple: when ordering an estimate from a construction company, you will probably end up with a 20 or even 30% larger amount than it actually is. If you doubt the truth of the data, then you can very well use the services of another “specialists” - these are auditors. As practice shows, the cost of the estimate will decrease by no less than 10%.

Examples

The photo below is an example of an estimate for a kitchen renovation. All types of work are arranged into categories for convenience. These types of estimates for room renovations will help you navigate and quickly figure out how much money will be spent on individual parts.

There are separate subsections dismantling work. When carrying out a major overhaul, there will be a need to dismantle not only or old decoration, but also pipes, including sewer ones. And given that the apartment has plumbing, this work will also affect the bathroom. It is rational to carry out renovations in the bathroom/toilet and kitchen together: this way you can save money. Next comes the treatment of the walls, floor and ceiling. Here you can see that the rough and Finishing work entered into one table, we would recommend separating them.

Also important stage When drawing up estimates, the installation of plumbing fixtures is not included. If it is better for specialists to finish welding the riser, since you have decided to use their labor, then it is quite possible to connect the mixer yourself; no serious skills or complex tools are needed for this.


As you can see, there are columns with units of measurement, areas and lengths of all work items. For ease of calculation, the price per unit of work and then the total cost are indicated. The estimate will extract more funds if you instruct construction company purchase of materials. But be careful here: replacement is often practiced quality materials and components for low-grade ones. Therefore, it is important to control every stage of the work.

The following is an approximate estimate for the renovation of the entire apartment; there is a slightly different drawing up scheme, but the meaning is the same. That is, unit prices and the total cost of work are indicated. As we can see, here the customer will most likely entrust the company with the purchase of materials; a special column is allocated for this, although it is possible that he will purchase it himself and enter this data for clarity. Here's a more thorough look. Pay attention to the last point: the customer even took into account the cost of descent construction waste, which is also important when carrying out major repairs.

Example of an estimate for apartment renovation

How to write justifications for major repairs of a school building, plans, estimates?

Answer

The justification for carrying out a major overhaul of the school building is the results of a technical inspection. It determines the degree of its physical and moral wear and tear, the need for repair and reconstruction work.

To conduct such a survey, it is necessary to involve a specialized organization under a civil contract to perform work.

<…>In accordance with clause 5.8 of the Regulations on the organization and conduct of reconstruction, repair and maintenance of residential buildings, communal and socio-cultural facilities (VSN 58-88 (r)), approved. By order of the State Committee for Architecture of November 23, 1988, the development of design and estimate documentation for major repairs and reconstruction of buildings (facilities) should include:

  • carrying out a technical inspection, determining the physical and moral wear and tear of design objects;
  • drawing up design estimates for all design decisions for redevelopment, functional reassignment of premises, replacement of structures, engineering systems or their re-installation, landscaping and other similar work;
  • feasibility study and;
  • development of a project for organizing major repairs and reconstruction and a project for the execution of work, which is developed by the contractor.<…>

The preparation of the listed documents requires engineering and survey work, and, accordingly, the required level of qualifications. Such an examination is carried out by a specialized organization under an agreement with an educational organization.

Consequently, establishing the need for a major overhaul of a school building is established based on the results of a technical inspection, determining the degree of physical and moral deterioration of the building. A contract for a technical inspection may also provide for the preparation of design estimates, a feasibility study and a work plan.

A technical inspection of the physical condition of a building can be carried out in accordance with GOST 31937-2011 "Buildings and structures. Rules for inspection and monitoring of technical condition", put into effect by Order of Rosstandart dated December 27, 2012 No. 1984-st.

A major renovation of a building is carried out to improve its appearance and operational properties. Over time, building structures lose their original appearance, and the condition of engineering systems may become unusable. Modern construction technologies allow not only to completely replace old engineering equipment with new ones, but also to change the appearance of the building beyond recognition.

Major repairs of buildings and structures involve a cycle of work to replace worn-out parts with improved and more economical ones. Thus, the operational capabilities of the building are improved, extending its service life. During a major overhaul, some objects may be restored or partially replaced. A complete replacement is not carried out for structures that have a very long service life: concrete and stone foundations, building walls, wall frames, underground pipes, etc. It is important to understand that major technical and economic indicators of the building are not affected during a major overhaul. Changing the size of an object and its parts, as well as replacing load-bearing structures relate to reconstruction work.

There are comprehensive overhauls and selective ones. The first type of overhaul means replacement work structural elements, engineering systems. These works cover the entire building as a whole. Selective overhaul involves the complete or partial replacement of some structural parts of a building or equipment that have become unusable. The type of major repair is assigned after determining the technical condition of a building.

Contract for major renovation of a building

The agreement must be drawn up. This document states:

  1. Subject of the agreement.
  2. Cost of work, terms of payment.
  3. Responsibilities assigned to the parties:
  • customer obligations;
  • contractor obligations.
  1. Duration of repair work.
  2. Force majeure situations.
  3. Manufacturing jobs.
  4. Acceptance of the object after completion of repair work.
  5. Guarantees.
  6. Arbitration.
  7. Property liability of the customer and contractor.
  8. Termination of an agreement.
  9. Special circumstances.
  10. Details of the parties, legal address.

The estimate for major repairs of a building is one of the important documents that appears when organizing repair work. The estimate indicates the cost of the work, where all expenses are detailed: wage, taxes, business expenses, payment Supplies and etc.

Before proceeding with the process of organizing a major overhaul, both parties need to become familiar with existing standards, rules and laws that may be useful when carrying out work: SNiP, OKPD, OKVED, OKDP, etc. Owning all necessary knowledge, the risk of conflicts and force majeure situations between the customer and the contractor is reduced.

Many schools in our city were built back in the days Soviet Union. Any building structure, which has been in operation for several decades, needs timely repairs. When it comes to the lives of children, you cannot risk their health and safety by ignoring the need for major repairs.

The opening of the school after a major renovation will certainly inspire students and teachers, because it is pleasant to be and teach in a new, stylish, modern school environment educational process. In addition, after major renovations, you don’t have to worry about the health of students and school staff. Replacing old windows and doors will eliminate the problem of drafts. Also, during major repairs, floors and walls are updated, electrical wiring, plumbing and many other outdated, faulty objects are adjusted. Schools after major renovations look unrecognizable! Big advantage carrying out major renovations at the school is something that can be done long years Don't worry about troubles like:

  • peeling plaster and paint;
  • uneven walls, floor;
  • drafts;
  • cold, damp rooms;
  • untidy interior and exterior
    and etc.

List possible works during a major renovation of the school

During a major overhaul of a school, the following work may be carried out:

  1. Foundation:
  • partial re-laying (no more than 10%), strengthening the stone foundation and basement walls;
  • restoration of insulation;
  • restoration of the blind area near the building (more than 20% of it total area);
  • repair of drainage around the building;
  • replacement of single pillars made of stone and concrete.
  1. Walls, columns:
  • putty of cracks;
  • repair of structures reinforcing stone walls;
  • relaying brick cornices, parapets, etc.;
  • relaying individual parts of walls made of stone (no more than 20% of the total volume of masonry);
  • reinforcement with clips;
  • repair of columns or their partial replacement (no more than 20% of the total volume);
  • replacement of in-wall storage tanks with stone, metal, reinforced concrete frames (no more than 40%).
  1. Partitions:
  • repair, replacement of partitions;
  • During the above works, partial redevelopment is allowed with an expansion of the area of ​​partitions of no more than 20%.
  1. Roofing, covering:
  • complete or partial replacement of the old coating with a new one;
  • complete or partial replacement of beams, purlins, crossbars;
  • repair of load-bearing structures of lanterns and floodlights;
  • complete or partial replacement of wall slopes, gutters, coverings chimneys and other devices.
  1. Floors, interfloor ceilings:
  • replacement and repair of interfloor ceilings;
  • replacement of individual outdated elements of interfloor ceilings with new ones;
  • strengthening of interfloor ceilings;
  • partial (more than 10% of the total area) or complete replacement gender;
  • refurbishment of the floor.
  1. Windows, doors:
  • replacement of window and door units;
  • replacement, strengthening of stairs.
  1. Interior work (cladding, plastering, painting):
  • repair of plaster (more than 10% of the total area);
  • replacement of cladding (more than 10% of the total area);
  • anti-corrosion coating of metal structures.
  1. Facades:
  • repair of cladding (more than 10% of the total area);
  • restoration of plaster (more than 10%);
  • restoration of cornices;
  • cleaning with sandblasting machines;
  • replacement of outdated parts of balconies and fences.
  1. Central heating:
  • complete or partial replacement of boiler equipment;
  • repair of foundations above boilers;
  • boiler room automation.
  1. Ventilation:
  • replacement of air ducts and fans;
  • replacement of electric motors, ventilation ducts, heaters, filters, etc.
  1. Water supply, sewerage:
  • complete or partial replacement of the pipeline;
  • replacement of insulation;
  • replacement of pumping units of pumping systems, pressure tanks.
  1. Hot water supply:
  • replacement of boilers, coils;
  • replacement of pipelines, pumping units of pumping systems, tanks, insulation.
  1. Electrical networks, communications:
  • replacement of fittings, hooks, traverses, wires;
  • repair, replacement of cable joints;
  • repair, replacement of grounding devices.
  1. Electric lighting, communication:
  • replacement of unusable parts of the network (more than 10%);
  • repair of cable channels;
  • replacement of safety shields;
  • replacement of lamps with other types.
  1. Roads for cars:
  • repair of drainage and drainage devices;
  • repair of fastening and protective structures of the roadbed;
  • repair, replacement of concrete slabs;
  • leveling cement-concrete pavement with asphalt concrete.

Repair work at the school is carried out regularly, before the start of each new school year. An educational institution should greet children in a clean and tidy manner so that children enjoy attending it.

School renovation is a large-scale undertaking that requires significant expenses. There are many premises here and all of them are used intensively throughout the year. In order to correctly calculate the amount of costs for school repairs, it is necessary to draw up a detailed estimate, which will include all finishing and other repair work.

Estimate for repair work at school

Like any other, the estimate for school renovation includes:

  • List of works that need to be done and the costs associated with their implementation
  • List of required building materials (in names and quantities)
  • Cost of building materials per unit of measurement

At the end of the estimate, the total cost of repairing the educational institution is calculated.

The calculation of estimates for an object such as a school must be carried out taking into account the Uniform Other Standards and Prices for Construction, Installation and Repair Work and correction factors. The market price cannot be taken into account, since it will be difficult to justify it in the report on the expenditure of budget funds.

Before starting to draw up an estimate for the renovation of an educational institution, it is necessary to first work out in detail the architectural part of the project (design of premises, building facades).

Drawing up an estimate for repairs

Calculating the estimate for school repairs depends on what task the owner of the facility sees before himself (i.e., what type of repair is planned). If we are talking about a major reconstruction of a building and its premises, then it may include costs for the following types works:

  • Redevelopment of premises
  • Roof repair
  • Complete or partial replacement of communications
  • Window replacement
  • Facade repair.

Estimate for finishing the school ( redecorating) does not involve large expenses; it usually provides for extremely inexpensive finishing work:

  • Painting windows and doors
  • Glazing
  • Wall decoration with wallpaper
  • Painting the floor or replacing linoleum.

The list of works and materials for their implementation is negotiated with the customer before drawing up the final estimate. A competent estimator is able to calculate the estimate, adjusting it to any budget (if the amount for its implementation has already been determined). At the request of the customer, he can reasonably “cut” or “wind up” consumable part estimates to the required amount.

A ready-made estimate for repairs is the main tool for monitoring the subsequent work of contractors providing construction services.

Qualified assistance in drawing up estimates

The creation of estimates is sometimes entrusted to representatives of construction organizations, who subsequently engage in repairs of the given object. In the case of school renovations, this is not always a viable option. The amount of expected expenses is usually required already at the stage of planning the budget of an educational institution for the new calendar year.

The amount of funding required for repairs can be calculated in advance. A specialist professionally involved in creating estimates will help with this.

You can order the services of a qualified estimator through the YouDo service. Yudu's contractors offer favorable prices for services and have extensive experience in drawing up cost estimates for public sector facilities.

To order an estimate, just leave an online application on the website.